Building control panels for hazardous areas? Whether it is a one-off for a project or the same design in volume, there is a certification route that fits. We help you pick it and get through it.
We prepare your technical file, get your panel ready for assessment and manage the certification for you, working with our notified body partner, Element Materials Technology. One point of contact, one quote.

Both end in a certified panel. The difference is whether you certify one panel, or a design you will build again and again.
As a general guide, if you will build the same design more than a handful of times, type approval usually costs less overall. We will tell you where that tipping point sits for you.
Build and sell certified panels in volume, without a unit verification every time.
Processes, procedures and records ready for the QAN or QAR audit.
Drawings and documents for each design, plus certificates for every Ex part.
An in-person audit. Any findings are closed before the notification is issued.
Whether testing is needed depends on the enclosure and component certificates.
From start to finish: 8 weeks if no testing is needed, up to 16 weeks if it is. A guideline only.
As long as every unit stays within what the certificate covers.

Under UL 508A the panel shop is approved, so a listed shop can build and label its own panels. ATEX and IECEx work the other way round: they certify equipment, never the workshop that built it.
There is no ATEX or IECEx equivalent of an approved panel shop. Every panel going into a European or IECEx hazardous area is certified on its own, or built to a certificate you hold.
Based in the USA? Get your quote through our partner, Eutex International, in Houston.
Contact EutexA QAN or QAR audit checks that the people designing, building and testing your panels are competent, and that you can prove it. Our training gives you that evidence.
ATEX & IECEx TrainingStill not covered? Send us the question. An engineer answers, not a chatbot.
Unit verification certifies one serial-numbered panel, under ATEX Module G or IECEx unit verification, with no QAN or QAR needed. Type approval certifies the design, so once you hold a QAN or QAR you can build as many as you like. One-offs suit unit verification; repeat builds suit type approval.
No. ATEX and IECEx certify equipment, not workshops. Each panel either needs unit verification, or must be built to a type certificate you hold, backed by a QAN or QAR.
No. Each unit is examined individually, so production quality assurance is not required. If you move to building the same design in series, you will need one.
When you build the same design repeatedly. Verification costs repeat with every unit, while a type certificate and a QAN or QAR are a one-off investment plus surveillance. We will work out the break-even point with you.
It depends on the unit, the protection concepts involved and how complete your documentation is. Send us the details and we will come back with one quote and a timescale.
Send us the drawings, the zone it is going into and how many you plan to build. We will recommend the route and give you one quote that covers it all.
Ex training and compliance support for hazardous area equipment manufacturers.